The IAC Statistics page displays the average assessment results for the selected criteria.
RESET
18,107 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $757,223 151,543 MMBtu
- Electrical $397,964 8,196,737 kWh
- Natural Gas $222,117 50,877 MMBtu
63,496 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,032 4,495 MMBtu
- Electrical $14,708 262,273 kWh
- Natural Gas $7,196 1,421 MMBtu
Waste $2,456
Productivity and General Resources $14,636
Other Resources $14,636
TOTAL $44,124
*May be negative reflecting an increased cost component required to save energy and costs overall
18,132 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $756,803 151,425 MMBtu
Electrical $397,844 8,192,465 kWh
Natural Gas $221,927 50,826 MMBtu
137,560 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $80,422 12,904 MMBtu
Electrical $44,445 825,906 kWh
Natural Gas $21,165 3,836 MMBtu
Waste $8,946
Productivity $47,430
TOTAL $136,799
Back to Top