The IAC Statistics page displays the average assessment results for the selected criteria.
RESET
18,760 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $764,492 152,869 MMBtu
- Electrical $401,254 8,300,249 kWh
- Natural Gas $221,626 51,250 MMBtu
65,775 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,710 4,543 MMBtu
- Electrical $15,254 270,290 kWh
- Natural Gas $7,032 1,394 MMBtu
Waste $2,484
Productivity and Other Cost Savings $14,440
TOTAL $44,634
*May be negative reflecting an increased cost component required to save energy and costs overall
18,785 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $764,076 152,753 MMBtu
- Electrical $401,133 8,295,988 kWh
- Natural Gas $221,443 51,200 MMBtu
142,044 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $81,335 12,955 MMBtu
- Electrical $45,204 834,388 kWh
- Natural Gas $20,885 3,789 MMBtu
Waste $8,870
Productivity and Other Cost Savings $46,590
TOTAL $136,796