18,466 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $761,806 151,899 MMBtu
- Electrical $400,990 8,239,259 kWh
- Natural Gas $221,522 50,792 MMBtu
64,991 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,496 4,546 MMBtu
- Electrical $15,111 269,286 kWh
- Natural Gas $7,111 1,408 MMBtu
Waste $2,454
Productivity and Other Cost Savings $14,584
TOTAL $44,534
*May be negative reflecting an increased cost component required to save energy and costs overall
18,491 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $761,388 151,783 MMBtu
- Electrical $400,867 8,235,013 kWh
- Natural Gas $221,336 50,742 MMBtu
140,064 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $80,884 12,909 MMBtu
- Electrical $44,885 828,903 kWh
- Natural Gas $20,903 3,794 MMBtu
Waste $8,910
Productivity and Other Cost Savings $46,805
TOTAL $136,598