The IAC Statistics page displays the average assessment results for the selected criteria.
RESET
18,986 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $775,674 155,198 MMBtu
- Electrical $404,727 8,357,174 kWh
- Natural Gas $227,092 53,135 MMBtu
66,319 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,701 4,532 MMBtu
- Electrical $15,294 270,447 kWh
- Natural Gas $6,981 1,385 MMBtu
Waste $2,466
Productivity and Other Cost Savings $14,306
TOTAL $44,473
*May be negative reflecting an increased cost component required to save energy and costs overall
19,011 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $775,249 155,080 MMBtu
- Electrical $404,603 8,352,889 kWh
- Natural Gas $226,904 53,083 MMBtu
143,595 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $82,045 13,037 MMBtu
- Electrical $45,703 842,933 kWh
- Natural Gas $20,792 3,783 MMBtu
Waste $8,817
Productivity and Other Cost Savings $46,325
TOTAL $137,188
Back to Top