The IAC Statistics page displays the average assessment results for the selected criteria.
RESET
18,200 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $759,947 151,945 MMBtu
- Electrical $399,138 8,223,354 kWh
- Natural Gas $222,576 51,041 MMBtu
63,840 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,040 4,493 MMBtu
- Electrical $14,735 262,669 kWh
- Natural Gas $7,174 1,418 MMBtu
Waste $2,448
Productivity and Other Cost Savings $14,576
TOTAL $44,064
*May be negative reflecting an increased cost component required to save energy and costs overall
18,225 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $759,525 151,826 MMBtu
- Electrical $399,016 8,219,067 kWh
- Natural Gas $222,386 50,990 MMBtu
138,229 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $80,499 12,906 MMBtu
- Electrical $44,484 826,434 kWh
- Natural Gas $21,107 3,828 MMBtu
Waste $8,929
Productivity and Other Cost Savings $47,220
TOTAL $136,647