The IAC Statistics page displays the average assessment results for the selected criteria.
RESET
17,833 Matching Assessments w/ Implementation Data
Initial Plant Averages Cost ($) Usage Unit
All Energy $752,940 151,267 MMBtu
- Electrical $395,171 8,158,453 kWh
- Natural Gas $222,239 50,851 MMBtu
62,766 Total Implemented Recommendations
3.5 Implemented Recommendations Per Assessment
Average
Implemented Impacts
Per Assessment*
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $27,029 4,503 MMBtu
- Electrical $14,649 261,673 kWh
- Natural Gas $7,251 1,431 MMBtu
Waste $2,485
Productivity and General Resources $14,757
Other Resources $14,757
TOTAL $44,271
*May be negative reflecting an increased cost component required to save energy and costs overall
17,860 Matching Assessments
Initial Plant Averages Cost ($) Usage Unit
All Energy $752,519 151,143 MMBtu
Electrical $395,035 8,153,690 kWh
Natural Gas $222,065 50,802 MMBtu
135,525 Total Recommendations
7.6 Recommendations Per Assessment
Average
Recommended Savings
Per Assessment
Cost ($)
Savings
Usage
Reduction
Unit
All Energy $79,378 12,754 MMBtu
Electrical $43,817 815,900 kWh
Natural Gas $21,174 3,810 MMBtu
Waste $8,933
Productivity $47,675
TOTAL $135,986
Back to Top