Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

144,853

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0650 # 01 Y: 01 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,107 $210 n/a
NC0650 # 02 Y: 02 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,080 $500 n/a
NC0650 # 03 Y: 03 INSTALL / REPAIR INSULATION ON STEAM LINES $2,430 $997 n/a
NC0650 # 04 Y: 04 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,651 $8,000 n/a
NC0650 # 05 Y: 05 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $955 $2,350 n/a
NC0650 # 06 Y: 06 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,730 $1,200 n/a
NC0650 # 07 Y: 07 ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR $9,314 $20,000 n/a
UD1018 # 01 Y: 01 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 n/a
UD1018 # 02 Y: 02 RECOVER WASTE HEAT FROM EQUIPMENT $62,174 $26,600 n/a
UD1018 # 03 Y: 03 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $25,124 $0 n/a
UD1018 # 04 Y: 04 REDESIGN PROCESS $43,180 $20,000 n/a
UD1018 # 05 Y: 05 ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR $1,584 $1,500 n/a
UD1018 # 06 Y: 06 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,717 $64,900 n/a
UD1018 # 07 Y: 07 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,072 $0 n/a
UD1018 # 08 Y: 08 INSULATE BARE EQUIPMENT $359 $392 n/a
UD1018 # 09 Y: 09 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $1,096,761 $5,000,000 n/a
AM0806 # 01 Y: 01 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $49,500 $85,000 n/a
AM0806 # 02 Y: 02 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,025 $24,685 n/a
AM0806 # 03 Y: 03 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,300 $10,600 n/a
AM0806 # 04 Y: 04 INSULATE BARE EQUIPMENT $5,470 $3,350 n/a
AM0806 # 05 Y: 05 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $1,000 n/a
AM0806 # 06 Y: 06 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,580 $2,250 n/a
AM0806 # 07 Y: 07 USE SYNTHETIC LUBRICANT $1,970 $300 n/a
AM0806 # 08 Y: 08 USE COMPRESSOR AIR FILTERS $1,040 $135 n/a
AM0806 # 09 Y: 09 PAY UTILITY BILLS ON TIME $484 $0 n/a