Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,464
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0230 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,667 | $900 | n/a |
WM0230 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $2,488 | n/a |
WM0230 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,743 | $4,500 | n/a |
WM0230 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $155,302 | $120,000 | n/a |
MI0452 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,049 | $4,092 | n/a |
MI0452 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,068 | $14,019 | n/a |
MI0452 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,550 | $1,660 | n/a |
MI0452 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,650 | $23,081 | n/a |
MI0452 # 09 Y:2024 | 09 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $204 | $590 | n/a |
MI0452 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,989 | $960 | n/a |
MI0452 # 07 Y:2024 | 07 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,069 | $3,165 | n/a |
UD1097 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $63,287 | $0 | n/a |
UD1097 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $900 | n/a |
MI0452 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,529 | $245,201 | n/a |
UD1097 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $14,406 | n/a |
UD1097 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,598 | $104 | n/a |
UD1097 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $320 | n/a |
MI0452 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,517 | $21,120 | n/a |
UD1097 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $0 | n/a |
UD1097 # 03 Y:2025 | 03 | 2025 | MINIMIZE WATER USAGE | $1,616 | $0 | n/a |
MI0452 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,470 | $860 | n/a |
UD1097 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,544 | $0 | n/a |
UD1097 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,568 | $0 | n/a |
NT0036 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,972 | $5,609 | n/a |
NT0036 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,170 | $16,268 | n/a |