Search recommendations based on selected criteria.
RESET

137,413

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
OR0696 # 01 Y:2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $179,573 $3,044
OR0696 # 02 Y:2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,265 $37,275
WM0115 # 05 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $550
WM0115 # 04 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $3,740
WM0115 # 02 Y:2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,812 $810
WM0115 # 03 Y:2017 USE SOLAR HEAT TO MAKE ELECTRICTY $7,532 $17,600
WM0115 # 01 Y:2017 USE SYNTHETIC LUBRICANT $11,231 $17,756
LS0012 # 06 Y:2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,215 $80,000
LS0012 # 05 Y:2017 REDUCE EXCESSIVE BOILER BLOWDOWN $3,685 $4,250
LS0012 # 04 Y:2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $21,748 $15,200
LS0012 # 03 Y:2017 INSULATE BARE EQUIPMENT $993 $548
LS0012 # 02 Y:2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,205 $920
LS0012 # 01 Y:2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,766 $12,000
UF0513 # 08 Y:2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053
UF0513 # 07 Y:2017 INSULATE STEAM / HOT WATER LINES $2,443 $1,481
Back to Top