Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,464
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0986 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $463,303 | $2,451,174 | n/a |
WV0673 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $55,596 | $232,663 | n/a |
WV0673 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,643 | $75,157 | n/a |
WV0673 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $6,139 | $11,569 | n/a |
WV0673 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,359 | $6,620 | n/a |
WV0673 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $4,399 | $2,317 | n/a |
WV0673 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,382 | $16,575 | n/a |
WV0673 # 07 Y:2024 | 07 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,917 | $5,832 | n/a |
WV0673 # 08 Y:2024 | 08 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,740 | $1,420 | n/a |
WV0673 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $560 | n/a |
WV0673 # 10 Y:2024 | 10 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $613 | $3,000 | n/a |
WV0673 # 11 Y:2024 | 11 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $470 | $887 | n/a |
WV0673 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $179 | $80 | n/a |
WV0673 # 13 Y:2024 | 13 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $688 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | n/a |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
UU0258 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,570 | $5,140 | n/a |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | n/a |
UU0258 # 08 Y:2024 | 08 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $180,000 | $20,000 | n/a |
UU0261 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,296 | $572,100 | n/a |
UU0261 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,592 | $37,200 | n/a |
UU0261 # 03 Y:2024 | 03 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $12,100 | $21,600 | n/a |