155,557
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0890 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,090 | $1,000 | n/a |
AM0890 # 04 Y:2023 | 04 | 2023 | PAY UTILITY BILLS ON TIME | $2,933 | $0 | n/a |
AM0890 # 09 Y:2023 | 09 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $89 | $38 | n/a |
AM0890 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM TEMPERATURE | $12,180 | $0 | n/a |
AM0890 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,310 | $0 | n/a |
AM0890 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $240 | $480 | n/a |
AM0890 # 07 Y:2023 | 07 | 2023 | USE SYNTHETIC LUBRICANT | $350 | $200 | n/a |
AM0890 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,790 | $18 | n/a |
AM0890 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,660 | $2,690 | n/a |
WV0652 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,902 | $2,750 | n/a |
WV0652 # 04 Y:2023 | 04 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,975 | $1,500 | n/a |
WV0652 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,958 | $210,200 | n/a |
WV0652 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $13,792 | $1,942 | n/a |
WV0652 # 10 Y:2023 | 10 | 2023 | INSULATE BARE EQUIPMENT | $506 | $166 | n/a |
WV0652 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,118 | $7,210 | n/a |
WV0652 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $193,156 | $160,000 | n/a |
WV0652 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $22,798 | $1,500 | n/a |
WV0652 # 06 Y:2023 | 06 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,659 | $22,700 | n/a |
WV0652 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,967 | $2,160 | n/a |
DL0226 # 10 Y:2023 | 10 | 2023 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $56,102 | $91,218 | n/a |
DL0226 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,718 | $0 | n/a |
DL0226 # 04 Y:2023 | 04 | 2023 | REDUCE VENTILATION AIR | $2,739 | $0 | n/a |
DL0226 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $1,234 | $0 | n/a |
DL0226 # 08 Y:2023 | 08 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $6,284 | $3,000 | n/a |
DL0226 # 05 Y:2023 | 05 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,421 | $3,000 | n/a |