150,069
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1072 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,749 | $0 | n/a |
OK1072 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $439 | $2,000 | n/a |
OK1072 # 04 Y:2022 | 04 | 2022 | INSTALL SUB-METERING EQUIPMENT | $173,223 | $1,272 | n/a |
OK1072 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $265,528 | $1,357,737 | n/a |
LS1322 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,827 | $100 | n/a |
LS1322 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $747 | $375 | n/a |
LS1322 # 03 Y:2022 | 03 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $5,493 | $3,200 | n/a |
LS1322 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,044 | $31,514 | n/a |
LE0525 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $150 | n/a |
LE0525 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,698 | $5,000 | n/a |
LE0525 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $108,808 | $250,000 | n/a |
LE0525 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $763 | $2,001 | n/a |
LE0525 # 05 Y:2022 | 05 | 2022 | BURN WOOD BY-PRODUCTS FOR HEAT | $41,476 | $130,000 | n/a |
LE0525 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,480 | $20,000 | n/a |
UA0257 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,160 | $80,028 | n/a |
UA0257 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,505 | $1,000 | n/a |
UA0257 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,741 | $8,591 | n/a |
UA0257 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,731 | $150 | n/a |
UA0257 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,573 | $5,533 | n/a |
CO0743 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,876 | $84,276 | n/a |
CO0743 # 02 Y:2022 | 02 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $9,304 | $42,082 | n/a |
CO0743 # 03 Y:2022 | 03 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,506 | $9,960 | n/a |
CO0743 # 04 Y:2022 | 04 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $1,718 | $4,820 | n/a |
CO0743 # 05 Y:2022 | 05 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $7,800 | $26,000 | n/a |
CW0123 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $105 | n/a |