Search recommendations based on selected criteria.
RESET

137,413

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
MZ0245 # 05 Y:2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,041 $3,300
MZ0245 # 03 Y:2017 OPTIMIZE PLANT POWER FACTOR $13,572 $12,250
MZ0245 # 04 Y:2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,371 $0
MZ0245 # 01 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,959 $47,658
MZ0245 # 02 Y:2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,450 $2,183
UU0125 # 08 Y:2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,690 $0
UU0125 # 07 Y:2017 MINIMIZE WATER USAGE $3,700 $200
UU0125 # 06 Y:2017 INSTALL OCCUPANCY SENSORS $4,418 $7,220
UU0125 # 05 Y:2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,417 $39,198
UU0125 # 04 Y:2017 RECOVER AND REUSE WASTE MATERIAL $6,187 $3,150
UU0125 # 03 Y:2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,110 $20
UU0125 # 02 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,851 $18,588
UU0125 # 01 Y:2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,802 $0
OR0696 # 04 Y:2017 USE MORE EFFICIENT LIGHT SOURCE $1,910 $10,116
OR0696 # 03 Y:2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,365 $5,880
Back to Top