Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,464
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0260 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $726 | $3,000 | n/a |
UU0260 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $489 | $1,818 | n/a |
WV0672 # 13 Y:2024 | 13 | 2024 | INSTALL OCCUPANCY SENSORS | $334 | $984 | n/a |
WV0672 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $401 | $38 | n/a |
WV0672 # 11 Y:2024 | 11 | 2024 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,964 | n/a |
WV0672 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $797 | $1,579 | n/a |
WV0672 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,102 | $753 | n/a |
WV0672 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,640 | $5,016 | n/a |
WV0672 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,058 | $6,936 | n/a |
WV0672 # 06 Y:2024 | 06 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,489 | $5,659 | n/a |
WV0672 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,087 | $759 | n/a |
WV0672 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,264 | $9,760 | n/a |
WV0672 # 03 Y:2024 | 03 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,948 | $26,406 | n/a |
WV0672 # 02 Y:2024 | 02 | 2024 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,278 | $31,216 | n/a |
WV0672 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,416 | $271,368 | n/a |
UD1096 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,210 | $242,106 | n/a |
UD1096 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,551 | $5,809 | n/a |
UD1096 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $6,096 | n/a |
UD1096 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $872 | n/a |
UD1096 # 03 Y:2024 | 03 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,522 | $1,061 | n/a |
UD1096 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $407 | $0 | n/a |
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |