IAC logo
IAC Assessment: IC0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2025
Principal Product Office Space
NAICS 551114 - Corporate, Subsidiary, and Regional Managing Offices
SIC 6541 - Title Abstract Offices
Sales <$500,000
# of Employees 630
Plant Area (Sq.Ft.) 197,763
Annual Production 1 Units
Production Hrs. Annual 2,919
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,426 2,812,732 kWh $0.06
Electricity Demand $76,900 6,352 kW-months/year $12.11
Electricity Fees $19,762 - $ -
Natural Gas $43,887 13,765 MMBtu $3.19
TOTAL ENERGY COSTS $298,975
RECOMMENDED SAVINGS* $38,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$593
Cost:
$3,461
$500 9,090 $93 8 - - $500
9,090
kWh
$93
8
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,248
Cost:
$81,420
$8,982 163,300 $7,266 600 - - $8,982
163,300
kWh
$7,266
600
kW-months/year
-
-
MMBtu
03: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$254
Cost:
$800
$164 2,983 $90 7 - - $164
2,983
kWh
$90
7
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$82
Cost:
$137
- - - - $82 26 -
-
kWh
-
-
kW-months/year
$82
26
MMBtu
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,821
Cost:
$2,450
$1,256 22,830 $565 47 - - $1,256
22,830
kWh
$565
47
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,189
Cost:
$1,828
$1,296 23,571 $893 74 - - $1,296
23,571
kWh
$893
74
kW-months/year
-
-
MMBtu
07: 2.1224 REPLACE BOILER Savings:
$17,004
Cost:
$104,568
- - - - $17,004 5,314 -
-
kWh
-
-
kW-months/year
$17,004
5,314
MMBtu
TOTAL RECOMMENDED Savings:
$38,190
Cost:
$194,664
$12,198 221,774 $8,907 736 $17,086 5,339 $12,198
221,774
kWh
$8,907
736
kW-months/year
$17,086
5,339
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas