Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations
Due to University and State restrictions around the country, all IAC assessment activities are temporarily on hold.
Click here for details about Coronavirus (COVID-19) Recovery Support programs

145,203

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0227 # 01 Y: 01 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,028 $2,600 n/a
UA0227 # 02 Y: 02 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,466 $1,345 n/a
UA0227 # 03 Y: 03 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,527 $250 n/a
UA0227 # 04 Y: 04 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $65,276 $72,800 n/a
UA0227 # 05 Y: 05 RECOVER WASTE HEAT FROM EQUIPMENT $45,805 $100,000 n/a
UA0227 # 06 Y: 06 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,578 $200 n/a
UA0227 # 07 Y: 07 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,570 $5,639 n/a
UU0168 # 01 Y: 01 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,906 $0 n/a
UU0168 # 02 Y: 02 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,729 $15,550 n/a
UU0168 # 03 Y: 03 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,221 $8,000 n/a
UU0168 # 04 Y: 04 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,063 $0 n/a
UU0168 # 05 Y: 05 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $251 $0 n/a
UU0168 # 06 Y: 06 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $178 $0 n/a
AS0488 # 01 Y: 01 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $118,609 $10,790 n/a
AS0488 # 02 Y: 02 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,944 $27,312 n/a
AS0488 # 03 Y: 03 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,602 $272 n/a
AS0488 # 04 Y: 04 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,344 $36 n/a
AS0488 # 05 Y: 05 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,864 $7,653 n/a
AS0488 # 06 Y: 06 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,828 $3,940 n/a
AS0488 # 07 Y: 07 INSTALL OCCUPANCY SENSORS $395 $1,840 n/a
BS0137 # 01 Y: 01 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,104 $0 n/a
BS0137 # 02 Y: 02 REDUCE VENTILATION AIR $2,625 $7,998 n/a
BS0137 # 03 Y: 03 UPGRADE OBSOLETE EQUIPMENT $4,702 $21,000 n/a
BS0137 # 04 Y: 04 INSTALL OCCUPANCY SENSORS $1,055 $1,765 n/a
BS0137 # 05 Y: 05 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,551 $13,500 n/a