Search recommendations based on selected criteria.
RESET

139,658

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
AM0763 # 01 Y:2018 SEGREGATE METALS FOR SALE TO A RECYCLER $327,000 $0
AM0763 # 02 Y:2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $515,700 $2,200,000
AM0763 # 03 Y:2018 USE POWER FACTOR CONTROLLERS $105,400 $136,400
LE0462 # 05 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,454 $24,417
LE0462 # 04 Y:2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,005 $2,000
LE0462 # 01 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,915 $1,000
LE0462 # 03 Y:2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $355
LE0462 # 02 Y:2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $15,808 $20,000
CL1808 # 04 Y:2018 TURN OFF EQUIPMENT WHEN NOT IN USE $397 $0
CL1808 # 03 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $921 $2,080
CL1808 # 01 Y:2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,024 $250
CL1808 # 02 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,834 $3,431
AM0762 # 08 Y:2018 KEEP EQUIPMENT CLEAN $730 $50
AM0762 # 07 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $540
AM0762 # 05 Y:2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,920 $50
Back to Top