Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
165,667
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0051 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $586 | $0 | n/a |
NT0051 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,603 | $6,709 | n/a |
NT0051 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,814 | $0 | n/a |
NT0051 # 01 Y:2025 | 01 | 2025 | REDUCE SCRAP PRODUCTION | $98,944 | $80,000 | n/a |
DL0261 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,337 | $90,000 | n/a |
DL0261 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,283 | $1,200 | n/a |
DL0261 # 03 Y:2025 | 03 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,021 | $7,950 | n/a |
DL0261 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,374 | $0 | n/a |
DL0261 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,489 | $720 | n/a |
DL0261 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,186 | $16,400 | n/a |
UU0282 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,270 | $22,800 | n/a |
UU0282 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $3,030 | $15,460 | n/a |
UU0282 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,350 | $3,000 | n/a |
UU0282 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $790 | $5,550 | n/a |
UU0282 # 09 Y:2025 | 09 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $1,130 | $2,230 | n/a |
UU0282 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,520 | $9,240 | n/a |
UU0282 # 02 Y:2025 | 02 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $21,900 | $12,000 | n/a |
UU0282 # 04 Y:2025 | 04 | 2025 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,300 | $2,900 | n/a |
UU0282 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $11,100 | $4,800 | n/a |
UU0282 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,800 | $9,600 | n/a |
AM0964 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,450 | $391,560 | n/a |
AM0964 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,372 | $15,151 | n/a |
AM0964 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $4,064 | $19,460 | n/a |
AM0964 # 03 Y:2025 | 03 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,267 | $54,600 | n/a |
AM0957 # 03 Y:2025 | 03 | 2025 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,190 | $1,291 | n/a |