IAC logo
IAC Assessment: UU0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product Steel Investment Casts
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 18,900
Annual Production 200,000 Pieces
Production Hrs. Annual 4,192
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $180,205 1,659,780 kWh $0.11
Electricity Fees $54,647 - $ -
Natural Gas $122,739 13,528 MMBtu $9.07
TOTAL ENERGY COSTS $357,591
RECOMMENDED SAVINGS* $74,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.8124 Hire Energy Manager Savings:
$11,100
Cost:
$4,800
$18,100 166,000 - - $12,200 1,350 $(-19,200) - - - $18,100
166,000
kWh
-
-
$
$12,200
1,350
MMBtu
$(-19,200)
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$21,900
Cost:
$12,000
- - - - - - - - $21,900 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
$21,900
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,800
Cost:
$9,600
- - $12,800 - - - - - - - -
-
kWh
$12,800
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,300
Cost:
$2,900
$7,300 67,000 - - - - - - - - $7,300
67,000
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$790
Cost:
$5,550
$790 7,200 - - - - - - - - $790
7,200
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$3,270
Cost:
$22,800
- - - - $3,270 360 - - - - -
-
kWh
-
-
$
$3,270
360
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,350
Cost:
$3,000
- - - - $9,350 1,030 - - - - -
-
kWh
-
-
$
$9,350
1,030
MMBtu
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,030
Cost:
$15,460
- - - - $3,030 334 - - - - -
-
kWh
-
-
$
$3,030
334
MMBtu
-
-
$
-
-
$
09: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,130
Cost:
$2,230
$1,130 10,400 - - - - - - - - $1,130
10,400
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,520
Cost:
$9,240
$3,520 32,300 - - - - - - - - $3,520
32,300
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$74,190
Cost:
$87,580
$30,840 282,900 $12,800 - $27,850 3,074 $(-19,200) - $21,900 - $30,840
282,900
kWh
$12,800
-
$
$27,850
3,074
MMBtu
$(-19,200)
-
$
$21,900
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost