IAC logo
IAC Recommendation Types
Sponsored by:
DOE MESC
IAC logo
IAC Recommendation Types
The Assessment Recommendation Codes ARC is a system for classifying recommendations. [Manual]
Reset
TOP ARC Description Recommendations Reccs Recommended $ Savings Average Payback (yrs) Implementation Rate Imp Rate
back 2.xxxx 2.xxxx ENERGY MANAGEMENT 137,046 $1,879,540,940 1.8 51.0%
back 2.6xxx 2.6xxx Operations 7,094 $58,458,548 0.6 55.2%
back 2.62xx 2.62xx EQUIPMENT CONTROL 6,494 $54,695,604 0.6 54.1%
2.622x 2.622x Equipment Scheduling 436 $8,501,883 0.6 62.1%
2.6221 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY 331 $6,232,531 0.7 63.6%
2.6222 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS 66 $1,497,661 0.3 60.3%
2.6223 2.6223 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY 10 $24,269 0.9 70.0%
2.6224 2.6224 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS 15 $42,095 0.7 50.0%
2.6225 2.6225 ELIMINATE THIRD SHIFT 7 $638,397 0.5 28.6%
2.6226 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE 6 $61,300 0.6 60.0%