IAC Assessment: UL2511
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2511
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2025
Principal Product Metal Cylanders
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 46,300
Annual Production 1,800,000 Units
Production Hrs. Annual 6,240
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,826 2,687,840 kWh $0.11
Electricity Demand $98,692 6,049 kW-months/year $16.32
Electricity Fees $39,045 - $ -
Natural Gas $24,151 3,710 MMBtu $6.51
TOTAL ENERGY COSTS $454,714
RECOMMENDED SAVINGS* $123,168 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption
$ kWh $ kW-months/year $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,525
Cost:
-
$4,525 41,547 - - - - $4,525
41,547
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,222
Cost:
$720
$4,222 38,766 - - - - $4,222
38,766
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,714
Cost:
$9,750
$7,714 70,838 - - - - $7,714
70,838
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,104
Cost:
$2,409
$3,218 29,552 $886 54 - - $3,218
29,552
kWh
$886
54
kW-months/year
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,468
Cost:
$1,480
$3,468 31,848 - - - - $3,468
31,848
kWh
-
-
kW-months/year
-
-
Tgal
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$33,929
Cost:
$245,037
$26,576 243,943 $7,353 451 - - $26,576
243,943
kWh
$7,353
451
kW-months/year
-
-
Tgal
07: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$65,206
Cost:
$43,234
$48,770 447,843 $11,235 684 $5,201 - $48,770
447,843
kWh
$11,235
684
kW-months/year
$5,201
-
Tgal
TOTAL RECOMMENDED Savings:
$123,168
Cost:
$302,630
$98,493 904,337 $19,474 1,189 $5,201 - $98,493
904,337
kWh
$19,474
1,189
kW-months/year
$5,201
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption