IAC logo
IAC Assessment: UW2509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2025
Principal Product Aircraft Engine and Parts Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 119,866
Annual Production 50,000 Pieces
Production Hrs. Annual 3,250
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,648 1,732,569 kWh $0.09
Electricity Demand $4,653 2,984 kW-months/year $1.56
Electricity Fees $14,336 - $ -
Natural Gas $131,434 8,280 MMBtu $15.87
TOTAL ENERGY COSTS $303,071
RECOMMENDED SAVINGS* $148,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$130,385
Cost:
$1,125,377
$129,679 1,471,951 $706 453 $129,679
1,471,951
kWh
$706
453
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,759
Cost:
$18,648
$2,590 29,393 $169 109 $2,590
29,393
kWh
$169
109
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,569
Cost:
$12,849
$6,569 74,568 - - $6,569
74,568
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,643
Cost:
$25,000
$8,113 92,088 $530 340 $8,113
92,088
kWh
$530
340
kW-months/year
TOTAL RECOMMENDED Savings:
$148,356
Cost:
$1,181,874
$146,951 1,668,000 $1,405 902 $146,951
1,668,000
kWh
$1,405
902
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand