IAC Assessment: UD1115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product matress
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 212,975
Annual Production 307,858,723 Units
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,641 1,091,231 kWh $0.13
Electricity Demand $41,174 6,015 kW-months/year $6.85
Electricity Fees $5,871 - $ -
Natural Gas $22,336 7,999 MMBtu $2.79
TOTAL ENERGY COSTS $213,780
RECOMMENDED SAVINGS* $34,416 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,515
Cost:
$7,035
$23,798 183,062 $1,717 251 - - - - $23,798
183,062
kWh
$1,717
251
kW-months/year
-
-
$
-
-
Tgal
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,927
Cost:
$3,700
- - - - $2,927 - - - -
-
kWh
-
-
kW-months/year
$2,927
-
$
-
-
Tgal
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,016
Cost:
$760
- - - - - - $1,016 287 -
-
kWh
-
-
kW-months/year
-
-
$
$1,016
287
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$892
Cost:
$1,267
$892 6,828 - - - - - - $892
6,828
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,587
Cost:
$5,423
$2,139 16,369 $448 65 - - - - $2,139
16,369
kWh
$448
65
kW-months/year
-
-
$
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,479
Cost:
$1,015
$1,219 9,327 $260 38 - - - - $1,219
9,327
kWh
$260
38
kW-months/year
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$34,416
Cost:
$19,200
$28,048 215,586 $2,425 354 $2,927 - $1,016 287 $28,048
215,586
kWh
$2,425
354
kW-months/year
$2,927
-
$
$1,016
287
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal