Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,247
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0323 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $497 | $1,045 | n/a |
IC0323 # 06 Y:2025 | 06 | 2025 | REPLACE BOILER | $5,000 | $39,055 | n/a |
IC0323 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $288 | n/a |
TT0330 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $508,143 | $2,436,747 | n/a |
TT0330 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $30,472 | $17,136 | n/a |
TT0330 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,346 | $1,500 | n/a |
TT0330 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,725 | $12,000 | n/a |
TT0330 # 05 Y:2025 | 05 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,614 | $38,380 | n/a |
TT0330 # 06 Y:2025 | 06 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $10,702 | $50,000 | n/a |
TT0330 # 07 Y:2025 | 07 | 2025 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,469 | $25,000 | n/a |
TT0330 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,319 | $3,400 | n/a |
TT0330 # 09 Y:2025 | 09 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,928 | $11,800 | n/a |
TT0330 # 10 Y:2025 | 10 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $928 | $5,000 | n/a |
TT0330 # 11 Y:2025 | 11 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $642 | $1,400 | n/a |
TT0330 # 12 Y:2025 | 12 | 2025 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $529 | $1,344 | n/a |
IC0322 # 01 Y:2025 | 01 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $102,930 | $45,500 | n/a |
IC0322 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,455 | $41,668 | n/a |
IC0322 # 03 Y:2025 | 03 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $36,404 | $43,673 | n/a |
IC0322 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,262 | $24,421 | n/a |
IC0322 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,041 | $210 | n/a |
IC0322 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,000 | $1,250 | n/a |
IC0322 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,658 | $693 | n/a |
IC0322 # 08 Y:2025 | 08 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $4,457 | $211 | n/a |
IC0322 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | n/a |
IC0322 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,536 | $2,000 | n/a |