IAC Assessment: SU0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2025
Principal Product Bottled Beverages - water, apple cider, apple/fruit fiber powder, bulk apple juice
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 255,000
Annual Production 23,000,000 Units
Production Hrs. Annual 5,200
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $699,074 13,885,618 kWh $0.05
Electricity Demand $108,005 34,124 kW-months/year $3.17
Electricity Fees $30,815 - $ -
Natural Gas $119,157 7,688 MMBtu $15.50
Other Gas $49,006 1 MMBtu $49,006.35
TOTAL ENERGY COSTS $1,006,057
RECOMMENDED SAVINGS* $21,989 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,400
Cost:
-
- - $5,400 1,706 - - -
-
kWh
$5,400
1,706
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,364
Cost:
-
$1,364 27,272 - - - - $1,364
27,272
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$299
Cost:
$63
$299 5,990 - - - - $299
5,990
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,304
Cost:
$446
- - - - $1,304 84 -
-
kWh
-
-
kW-months/year
$1,304
84
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,033
Cost:
$372
$1,033 20,655 - - - - $1,033
20,655
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,135
Cost:
$2,941
$1,135 22,705 - - - - $1,135
22,705
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$11,453
Cost:
$34,327
$(-10,483) (-209,664) - - $21,936 1,415 $(-10,483)
(-209,664)
kWh
-
-
kW-months/year
$21,936
1,415
MMBtu
TOTAL RECOMMENDED Savings:
$21,989
Cost:
$38,149
$(-6,652) (-133,043) $5,400 1,706 $23,240 1,499 $(-6,652)
(-133,043)
kWh
$5,400
1,706
kW-months/year
$23,240
1,499
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas