IAC logo
IAC Recommendation Types
Sponsored by:
DOE MESC
IAC logo
IAC Recommendation Types
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The Assessment Recommendation Codes ARC is a system for classifying recommendations. [Manual]
Reset
TOP ARC Description Recommendations Reccs Recommended $ Savings Average Payback (yrs) Implementation Rate Imp Rate
back 2.xxxx 2.xxxx ENERGY MANAGEMENT 141,237 $1,983,465,734 1.8 51.0%
back 2.3xxx 2.3xxx Electrical Power 6,660 $329,925,939 1.6 35.9%
back 2.31xx 2.31xx DEMAND MANAGEMENT 3,204 $51,457,171 0.7 40.1%
2.313x 2.313x Scheduling 2,412 $29,433,065 0.4 41.8%
2.3131 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS 1,550 $20,960,988 0.4 39.9%
2.3132 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS 501 $2,596,177 0.6 52.2%
2.3133 2.3133 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY 8 $44,945 0.2 42.9%
2.3134 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION 124 $2,723,636 0.2 28.4%
2.3135 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS 24 $113,575 0.2 50.0%
2.3136 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS 17 $26,820 0.3 17.6%
2.3137 2.3137 USE POWER DURING OFF-PEAK PERIODS 188 $2,966,924 0.3 40.1%