IAC logo
IAC Assessment: AM0962
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0962
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2025
Principal Product Structural Steel
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 90
Plant Area (Sq.Ft.) 70,000
Annual Production 7,500 Tons
Production Hrs. Annual 5,699
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,300 718,310 kWh $0.08
Electricity Demand $28,244 3,563 kW-months/year $7.93
Electricity Fees $12,437 - $ -
Natural Gas $1,070 93 MMBtu $11.49
TOTAL ENERGY COSTS $101,051
RECOMMENDED SAVINGS* $102,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,340
Cost:
$2,220
$6,200 74,500 - - $2,140 - $6,200
74,500
kWh
-
-
kW-months/year
$2,140
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$23,920
Cost:
$15,000
- - - - $23,920 - -
-
kWh
-
-
kW-months/year
$23,920
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,160
Cost:
$25,084
$4,180 50,300 $980 124 - - $4,180
50,300
kWh
$980
124
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,200
Cost:
$2,449
$3,160 38,000 $678 86 $362 - $3,160
38,000
kWh
$678
86
kW-months/year
$362
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,920
Cost:
$3,290
- - $2,920 368 - - -
-
kWh
$2,920
368
kW-months/year
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$1,950
Cost:
$6,536
$1,950 23,400 - - - - $1,950
23,400
kWh
-
-
kW-months/year
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$862
Cost:
$406
$262 3,160 $600 76 - - $262
3,160
kWh
$600
76
kW-months/year
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$312
Cost:
-
$145 1,750 $167 21 - - $145
1,750
kWh
$167
21
kW-months/year
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$55,000
Cost:
$363,450
$55,000 655,000 - - - - $55,000
655,000
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$102,664
Cost:
$418,435
$70,897 846,110 $5,345 675 $26,422 - $70,897
846,110
kWh
$5,345
675
kW-months/year
$26,422
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost