IAC logo
IAC Assessment: AM0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product VITREOUS CHINA WARE
NAICS n/a
SIC 3261 - Vitreous Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,474 3,450,176 kWh $0.06
Natural Gas $399,208 148,950 MMBtu $2.68
TOTAL ENERGY COSTS $620,682
RECOMMENDED SAVINGS* $25,426 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,371
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$18,200
Cost:
$4,950
- - $18,200 7,570 -
-
kWh
$18,200
7,570
MMBtu
02: 2.2428 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC Savings:
$5,635
Cost:
$15,350
- - $5,635 2,343 -
-
kWh
$5,635
2,343
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$625
Cost:
$2,180
- - $625 260 -
-
kWh
$625
260
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$426
Cost:
$300
$426 12,896 - - $426
12,896
kWh
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$420
Cost:
-
$420 12,896 - - $420
12,896
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$120
Cost:
$120
$120 3,517 - - $120
3,517
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$25,426
Cost:
$22,900
$966 29,309 $24,460 10,173 $966
29,309
kWh
$24,460
10,173
MMBtu
TOTAL IMPLEMENTED Savings:
$19,371
Cost:
$7,550
$546 16,413 $18,825 7,830 $546
16,413
kWh
$18,825
7,830
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas