IAC Assessment: AM0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product POTATO AND CORN CHIPS
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 49,200,000 Pounds
Production Hrs. Annual 7,272
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $443,437 10,279,895 kWh $0.04
Natural Gas $494,315 229,666 MMBtu $2.15
TOTAL ENERGY COSTS $937,752
RECOMMENDED SAVINGS* $76,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,818
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$24,900
Cost:
$1,100
- - $24,900 12,000 -
-
kWh
$24,900
12,000
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$23,100
Cost:
$80,000
- - $23,100 11,200 -
-
kWh
$23,100
11,200
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,600
Cost:
$31,600
$(-2,650) (-58,617) $15,250 7,350 $(-2,650)
(-58,617)
kWh
$15,250
7,350
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,200
Cost:
$1,400
- - $7,200 3,500 -
-
kWh
$7,200
3,500
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,900
Cost:
$350
$6,900 272,567 - - $6,900
272,567
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$757
Cost:
-
$757 29,601 - - $757
29,601
kWh
-
-
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$718
Cost:
$10,000
$718 11,137 - - $718
11,137
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$76,175
Cost:
$124,450
$5,725 254,688 $70,450 34,050 $5,725
254,688
kWh
$70,450
34,050
MMBtu
TOTAL IMPLEMENTED Savings:
$62,818
Cost:
$92,850
$7,618 283,704 $55,200 26,700 $7,618
283,704
kWh
$55,200
26,700
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas