IAC logo
IAC Assessment: AM0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1993
Principal Product down hole oil well euipment
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 687,000 Pieces
Production Hrs. Annual 5,192
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,390 5,338,511 kWh $0.06
TOTAL ENERGY COSTS $301,390
RECOMMENDED SAVINGS* $22,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,990
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,380
Cost:
$20,925
$6,380 - - - $6,380
-
kWh
-
-
MMBtu
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$7,055
Cost:
$1,160
$4,235 159,730 $2,820 725 $4,235
159,730
kWh
$2,820
725
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,568
Cost:
$3,090
$3,568 - - - $3,568
-
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,650
Cost:
$7,350
$1,650 61,841 - - $1,650
61,841
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,470
Cost:
$420
$1,470 55,686 - - $1,470
55,686
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$990
Cost:
$2,140
$990 37,515 - - $990
37,515
kWh
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$390
Cost:
$1,000
$390 14,654 - - $390
14,654
kWh
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$530
Cost:
$153
$530 9,086 - - $530
9,086
kWh
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$299
Cost:
-
$299 7,034 - - $299
7,034
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,332
Cost:
$36,238
$19,512 345,546 $2,820 725 $19,512
345,546
kWh
$2,820
725
MMBtu
TOTAL IMPLEMENTED Savings:
$2,990
Cost:
$2,713
$2,990 102,287 - - $2,990
102,287
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas