IAC logo
IAC Assessment: AM0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1994
Principal Product Kelly and wireline valves, drill pipe, oil well tools
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 188,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 7,224
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $485,113 6,779,602 kWh $0.07
Natural Gas $252,377 77,118 MMBtu $3.27
TOTAL ENERGY COSTS $737,490
RECOMMENDED SAVINGS* $58,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,395
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$37,480
Cost:
$3,520
$37,480 679,953 - - $37,480
679,953
kWh
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,700
Cost:
$26,650
$18,700 - - - $18,700
-
kWh
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,915
Cost:
-
- - $1,915 - -
-
kWh
$1,915
-
$
TOTAL RECOMMENDED Savings:
$58,095
Cost:
$30,170
$56,180 679,953 $1,915 - $56,180
679,953
kWh
$1,915
-
$
TOTAL IMPLEMENTED Savings:
$39,395
Cost:
$3,520
$37,480 679,953 $1,915 - $37,480
679,953
kWh
$1,915
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes