IAC logo
IAC Assessment: AM0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1994
Principal Product High and low carbon steel wiredrawing
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 71,000
Annual Production 30,000 Tons
Production Hrs. Annual 7,340
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,150 3,138,628 kWh $0.08
Natural Gas $167,823 49,220 MMBtu $3.41
TOTAL ENERGY COSTS $405,973
RECOMMENDED SAVINGS* $23,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $450
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$10,770
Cost:
$200,000
$44,640 733,880 $(-33,870) (-9,235) $44,640
733,880
kWh
$(-33,870)
(-9,235)
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,160
Cost:
$540
- - $6,160 1,680 -
-
kWh
$6,160
1,680
MMBtu
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,350
Cost:
$300
$5,350 102,872 - - $5,350
102,872
kWh
-
-
MMBtu
04: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$790
Cost:
$1,000
- - $790 222 -
-
kWh
$790
222
MMBtu
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$450
Cost:
$680
- - $450 122 -
-
kWh
$450
122
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$300
Cost:
-
- - $300 81 -
-
kWh
$300
81
MMBtu
TOTAL RECOMMENDED Savings:
$23,820
Cost:
$202,520
$49,990 836,752 $(-26,170) (-7,130) $49,990
836,752
kWh
$(-26,170)
(-7,130)
MMBtu
TOTAL IMPLEMENTED Savings:
$450
Cost:
$680
- - $450 122 -
-
kWh
$450
122
MMBtu
Savings
Cost
$ kWh $ MMBtu