Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1994 |
Principal Product | Commercial Heat Treating of Metals |
NAICS | n/a |
SIC | 3398 - Metal Heat Treating |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 91,300 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $523,395 | 7,734,760 | kWh | $0.07 |
Natural Gas | $172,520 | 52,314 | MMBtu | $3.30 |
TOTAL ENERGY COSTS | $695,915 | |||
RECOMMENDED SAVINGS* | $61,990 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $51,490 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $33,100 Cost: $81,000 |
- | - | $33,100 | 10,000 | - | - | - | - |
- - kWh |
$33,100 10,000 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $13,670 Cost: $15,000 |
$20,200 | 419,109 | $(-6,530) | (-1,910) | - | - | - | - |
$20,200 419,109 kWh |
$(-6,530) (-1,910) MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $10,500 Cost: $13,000 |
$10,500 | - | - | - | - | - | - | - |
$10,500 - kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $2,260 Cost: - |
$2,260 | 42,790 | - | - | - | - | - | - |
$2,260 42,790 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $730 Cost: $200 |
$730 | 26,084 | - | - | - | - | - | - |
$730 26,084 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $1,440 Cost: $7,900 |
- | - | - | - | - | - | $1,440 | 47,390 |
- - kWh |
- - MMBtu |
- - gal |
$1,440 47,390 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $290 Cost: - |
- | - | - | - | $290 | 143 | - | - |
- - kWh |
- - MMBtu |
$290 143 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) |
Savings: - Cost: $7,500 |
- | - | - | - | - | 130 | - | - |
- - kWh |
- - MMBtu |
- 130 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.7211 MODIFY MATERIAL APPLICATION METHODS |
Savings: - Cost: $7,500 |
- | - | - | - | - | 12 | - | - |
- - kWh |
- - MMBtu |
- 12 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,990 Cost: $132,100 |
$33,690 | 487,983 | $26,570 | 8,090 | $290 | 285 | $1,440 | 47,390 | $33,690 487,983 kWh |
$26,570 8,090 MMBtu |
$290 285 gal |
$1,440 47,390 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $51,490 Cost: $111,600 |
$23,190 | 487,983 | $26,570 | 8,090 | $290 | 155 | $1,440 | 47,390 | $23,190 487,983 kWh |
$26,570 8,090 MMBtu |
$290 155 gal |
$1,440 47,390 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) |