Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Coffee, Tea
NAICS n/a
SIC 2095 - Roasted Coffee
Sales $100,000,000-$500,000,000
# of Employees 234
Plant Area (Sq.Ft.) 250,000
Annual Production 63,000,000 Pounds
Production Hrs. Annual 4,277
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $296,850 7,765,240 kWh $0.04
Electricity Demand $132,380 19,507 kW-months/year $6.79
TOTAL ENERGY COSTS $475,541
RECOMMENDED SAVINGS* $47,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,770
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,300
Cost:
$65,100
- - $27,300 2,217 - - -
-
kWh
$27,300
2,217
kW-months/year
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,640
Cost:
$1,000
$2,640 131,887 - - - - $2,640
131,887
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,040
Cost:
$2,500
$2,040 102,579 - - - - $2,040
102,579
kWh
-
-
kW-months/year
-
-
Tgal
04: 3.4155 METER WASTE WATER Savings:
$9,790
Cost:
$2,200
- - - - $9,790 20,800,000 -
-
kWh
-
-
kW-months/year
$9,790
20,800,000
Tgal
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$6,110
Cost:
$4,380
- - - - $6,110 8,295,000 -
-
kWh
-
-
kW-months/year
$6,110
8,295,000
Tgal
TOTAL RECOMMENDED Savings:
$47,880
Cost:
$75,180
$4,680 234,466 $27,300 2,217 $15,900 29,095,000 $4,680
234,466
kWh
$27,300
2,217
kW-months/year
$15,900
29,095,000
Tgal
TOTAL IMPLEMENTED Savings:
$41,770
Cost:
$70,800
$4,680 234,466 $27,300 2,217 $9,790 20,800,000 $4,680
234,466
kWh
$27,300
2,217
kW-months/year
$9,790
20,800,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal