IAC Assessment: AM0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Plastic film
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 108,750
Annual Production 1,093,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $596,639 19,784,291 kWh $0.03
Electricity Demand $224,023 36,989 kW-months/year $6.06
Electricity Fees $10,045 - $ -
Natural Gas $37,148 6,896 MMBtu $5.39
TOTAL ENERGY COSTS $867,855
RECOMMENDED SAVINGS* $82,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$49,000
Cost:
$70,000
- - $49,000 3,979 - - - - - - - - -
-
kWh
$49,000
3,979
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$30,300
Cost:
$47,880
$46,250 2,102,286 $35,450 2,880 - - $(-51,400) (-9,558) - - - - $46,250
2,102,286
kWh
$35,450
2,880
kW-months/year
-
-
$
$(-51,400)
(-9,558)
MMBtu
-
-
gal
-
-
lb
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,830
Cost:
$5,660
- - - - $2,830 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,830
-
$
-
-
MMBtu
-
-
gal
-
-
lb
04: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM Savings:
$465
Cost:
-
- - - - - - - - $465 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$465
-
gal
-
-
lb
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$340
Cost:
-
- - - - - - - - - - $340 1,400 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$340
1,400
lb
TOTAL RECOMMENDED Savings:
$82,935
Cost:
$123,540
$46,250 2,102,286 $84,450 6,859 $2,830 - $(-51,400) (-9,558) $465 - $340 1,400 $46,250
2,102,286
kWh
$84,450
6,859
kW-months/year
$2,830
-
$
$(-51,400)
(-9,558)
MMBtu
$465
-
gal
$340
1,400
lb
TOTAL IMPLEMENTED Savings:
$51,830
Cost:
$75,660
- - $49,000 3,979 $2,830 - - - - - - - -
-
kWh
$49,000
3,979
kW-months/year
$2,830
-
$
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)