IAC Assessment: AM0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Steel fabrication, structural steel baseplates for gas turbi
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 265
Plant Area (Sq.Ft.) 172,200
Annual Production 7,204 Pieces
Production Hrs. Annual 3,298
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,792 4,229,191 kWh $0.06
Electricity Demand $60,713 20,430 kW-months/year $2.97
Electricity Fees $2,423 - $ -
Natural Gas $4,358 950 MMBtu $4.59
TOTAL ENERGY COSTS $326,286
RECOMMENDED SAVINGS* $136,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,290
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ gal $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$64,000
Cost:
-
- - - - $64,000 - - - - - - - -
-
kWh
-
-
kW-months/year
$64,000
-
$
-
-
gal
-
-
lb
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$40,000
Cost:
$24,270
- - - - - - $40,000 32,100 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$40,000
32,100
gal
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$21,900
Cost:
$22,340
- - $21,900 3,986 - - - - - - - - -
-
kWh
$21,900
3,986
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
04: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$4,960
Cost:
$110
- - - - - - - - $4,960 9,720 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$4,960
9,720
lb
-
-
$
05: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$2,070
Cost:
$300
$1,800 35,756 $270 49 - - - - - - - - $1,800
35,756
kWh
$270
49
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,880
Cost:
$300
$1,880 38,101 - - - - - - - - - - $1,880
38,101
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
07: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$770
Cost:
$1,460
- - - - - - - - - - $770 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
lb
$770
-
$
08: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$510
Cost:
-
- - - - $510 - - - - - - - -
-
kWh
-
-
kW-months/year
$510
-
$
-
-
gal
-
-
lb
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$260
Cost:
-
$260 5,275 - - - - - - - - - - $260
5,275
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$136,350
Cost:
$48,780
$3,940 79,132 $22,170 4,035 $64,510 - $40,000 32,100 $4,960 9,720 $770 - $3,940
79,132
kWh
$22,170
4,035
kW-months/year
$64,510
-
$
$40,000
32,100
gal
$4,960
9,720
lb
$770
-
$
TOTAL IMPLEMENTED Savings:
$88,290
Cost:
$22,640
$1,880 38,101 $21,900 3,986 $64,510 - - - - - - - $1,880
38,101
kWh
$21,900
3,986
kW-months/year
$64,510
-
$
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Solid Waste (non-haz) Personnel Changes