IAC logo
IAC Assessment: AM0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Industrial and marine lighting fixtures
NAICS n/a
SIC 3646 - Commercial Lighting Fixtures
Sales $10,000,000-$50,000,000
# of Employees 163
Plant Area (Sq.Ft.) 100,700
Annual Production 41,500 Pieces
Production Hrs. Annual 2,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,031 1,413,247 kWh $0.07
Electricity Demand $27,305 9,258 kW-months/year $2.95
Electricity Fees $2,129 - $ -
Natural Gas $20,580 5,245 MMBtu $3.92
TOTAL ENERGY COSTS $146,312
RECOMMENDED SAVINGS* $28,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,377
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,700
Cost:
$7,500
- - - - - - $2,900 58,300 $6,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,900
58,300
lb
$6,800
-
$
02: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$7,280
Cost:
$150
- - - - - - $7,280 14,720 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,280
14,720
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,495
Cost:
$4,715
- - $4,495 1,277 - - - - - - -
-
kWh
$4,495
1,277
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,200
Cost:
$1,000
$2,200 39,859 - - - - - - - - $2,200
39,859
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,080
Cost:
-
- - - - - - $2,080 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,080
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,200
Cost:
$300
$1,200 22,860 - - - - - - - - $1,200
22,860
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,022
Cost:
$840
- - - - $1,022 - - - - - -
-
kWh
-
-
kW-months/year
$1,022
-
$
-
-
lb
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$460
Cost:
-
- - - - $460 - - - - - -
-
kWh
-
-
kW-months/year
$460
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$28,437
Cost:
$14,505
$3,400 62,719 $4,495 1,277 $1,482 - $12,260 73,020 $6,800 - $3,400
62,719
kWh
$4,495
1,277
kW-months/year
$1,482
-
$
$12,260
73,020
lb
$6,800
-
$
TOTAL IMPLEMENTED Savings:
$9,377
Cost:
$6,855
$3,400 62,719 $4,495 1,277 $1,482 - - - - - $3,400
62,719
kWh
$4,495
1,277
kW-months/year
$1,482
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes