IAC Assessment: AM0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Asphalt roofing shingles
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 141,750
Annual Production 132,000,000 Pieces
Production Hrs. Annual 7,992
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,724 5,788,394 kWh $0.02
Electricity Demand $94,940 15,142 kW-months/year $6.27
Natural Gas $59,358 18,040 MMBtu $3.29
TOTAL ENERGY COSTS $306,662
RECOMMENDED SAVINGS* $87,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,757
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$35,800
Cost:
$137,500
- - - - - - $(-1,800) (-561) $37,600 2,743,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$(-1,800)
(-561)
MMBtu
$37,600
2,743,000
lb
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,300
Cost:
$25,000
- - $23,300 1,890 - - - - - - - - - - -
-
kWh
$23,300
1,890
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$12,000
Cost:
$410
- - - - - - - - - - $12,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$12,000
-
$
-
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$10,900
Cost:
$9,000
- - - - - - - - - - - - $10,900 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$10,900
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,662
Cost:
-
- - - - $2,662 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,662
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,540
Cost:
-
$580 24,326 $960 78 - - - - - - - - - - $580
24,326
kWh
$960
78
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$555
Cost:
$320
$555 23,154 - - - - - - - - - - - - $555
23,154
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$540
Cost:
-
$540 22,567 - - - - - - - - - - - - $540
22,567
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$130
Cost:
$24
$70 3,224 $60 5 - - - - - - - - - - $70
3,224
kWh
$60
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$87,427
Cost:
$172,254
$1,745 73,271 $24,320 1,973 $2,662 - $(-1,800) (-561) $37,600 2,743,000 $12,000 - $10,900 - $1,745
73,271
kWh
$24,320
1,973
kW-months/year
$2,662
-
$
$(-1,800)
(-561)
MMBtu
$37,600
2,743,000
lb
$12,000
-
$
$10,900
-
$
TOTAL IMPLEMENTED Savings:
$16,757
Cost:
$730
$1,135 47,480 $960 78 $2,662 - - - - - $12,000 - - - $1,135
47,480
kWh
$960
78
kW-months/year
$2,662
-
$
-
-
MMBtu
-
-
lb
$12,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material