Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1998 |
Principal Product | Steel centrifugal castings |
NAICS | n/a |
SIC | 3325 - Steel Foundries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 120,800 |
Annual Production | 4,700,000 Pounds |
Production Hrs. Annual | 3,980 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $227,691 | 4,974,502 | kWh | $0.05 |
Electricity Demand | $200,369 | 23,959 | kW-months/year | $8.36 |
Natural Gas | $122,307 | 42,097 | MMBtu | $2.91 |
TOTAL ENERGY COSTS | $577,102 | |||
RECOMMENDED SAVINGS* | $21,330 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,895 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4155 METER WASTE WATER |
Savings: $7,230 Cost: $8,500 |
- | - | - | - | $7,230 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$7,230 - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6113 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS |
Savings: $6,620 Cost: $16,675 |
- | - | $(-210) | (-70) | - | - | $7,370 | 61,400 | - | - | $(-540) | - |
- - kWh |
$(-210) (-70) MMBtu |
- - Tgal |
$7,370 61,400 gal |
- - gal |
$(-540) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8221 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) |
Savings: $2,605 Cost: $3,090 |
- | - | - | - | - | - | - | - | $2,605 | 150 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - gal |
$2,605 150 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,700 Cost: $2,665 |
$1,700 | 61,547 | - | - | - | - | - | - | - | - | - | - |
$1,700 61,547 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $830 Cost: $100 |
- | - | - | - | - | - | - | - | - | - | $830 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
$830 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $775 Cost: $1,200 |
$75 | 2,638 | - | - | - | - | - | - | - | - | $700 | - |
$75 2,638 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
$700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $460 Cost: - |
$460 | 24,619 | - | - | - | - | - | - | - | - | - | - |
$460 24,619 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $380 Cost: - |
$380 | 16,706 | - | - | - | - | - | - | - | - | - | - |
$380 16,706 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $380 Cost: - |
$380 | 13,482 | - | - | - | - | - | - | - | - | - | - |
$380 13,482 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $350 Cost: $20 |
$350 | 5,275 | - | - | - | - | - | - | - | - | - | - |
$350 5,275 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,330 Cost: $32,250 |
$3,345 | 124,267 | $(-210) | (-70) | $7,230 | - | $7,370 | 61,400 | $2,605 | 150 | $990 | - | $3,345 124,267 kWh |
$(-210) (-70) MMBtu |
$7,230 - Tgal |
$7,370 61,400 gal |
$2,605 150 gal |
$990 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,895 Cost: $29,060 |
$3,345 | 124,267 | $(-210) | (-70) | $7,230 | - | $7,370 | 61,400 | - | - | $160 | - | $3,345 124,267 kWh |
$(-210) (-70) MMBtu |
$7,230 - Tgal |
$7,370 61,400 gal |
- - gal |
$160 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Personnel Changes |