Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1999 |
Principal Product | Transformers, switchgear |
NAICS | n/a |
SIC | 3612 - Transformers, Except Electronic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 470 Pieces |
Production Hrs. Annual | 6,040 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,650 | 1,221,278 | kWh | $0.04 |
Electricity Demand | $25,186 | 3,515 | kW-months/year | $7.17 |
TOTAL ENERGY COSTS | $74,836 | |||
RECOMMENDED SAVINGS* | $55,735 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $50,195 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $49,500 Cost: $21,000 |
$16,000 | 694,607 | $15,900 | 1,212 | $17,600 | 3,160 | - | - | - | - | - | - |
$16,000 694,607 kWh |
$15,900 1,212 kW-months/year |
$17,600 3,160 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $4,830 Cost: $75 |
- | - | - | - | - | - | - | - | - | - | $4,830 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$4,830 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $380 Cost: $360 |
$60 | 2,638 | $50 | 4 | - | - | - | - | $270 | - | - | - |
$60 2,638 kWh |
$50 4 kW-months/year |
- - MMBtu |
- - lb |
$270 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $315 Cost: $35 |
$115 | 4,982 | $200 | 15 | - | - | - | - | - | - | - | - |
$115 4,982 kWh |
$200 15 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $300 Cost: $500 |
$300 | 12,896 | - | - | - | - | - | - | - | - | - | - |
$300 12,896 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $240 Cost: $400 |
- | - | - | - | - | - | $240 | 720 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$240 720 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $170 Cost: - |
$170 | 7,327 | - | - | - | - | - | - | - | - | - | - |
$170 7,327 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,735 Cost: $22,370 |
$16,645 | 722,450 | $16,150 | 1,231 | $17,600 | 3,160 | $240 | 720 | $270 | - | $4,830 | - | $16,645 722,450 kWh |
$16,150 1,231 kW-months/year |
$17,600 3,160 MMBtu |
$240 720 lb |
$270 - $ |
$4,830 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $50,195 Cost: $21,395 |
$16,175 | 702,227 | $16,150 | 1,231 | $17,600 | 3,160 | - | - | $270 | - | - | - | $16,175 702,227 kWh |
$16,150 1,231 kW-months/year |
$17,600 3,160 MMBtu |
- - lb |
$270 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |