IAC Assessment: AM0343
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0343
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Transformers, switchgear
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 50,000
Annual Production 470 Pieces
Production Hrs. Annual 6,040
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,650 1,221,278 kWh $0.04
Electricity Demand $25,186 3,515 kW-months/year $7.17
TOTAL ENERGY COSTS $74,836
RECOMMENDED SAVINGS* $55,735 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$49,500
Cost:
$21,000
$16,000 694,607 $15,900 1,212 $17,600 3,160 - - - - - - $16,000
694,607
kWh
$15,900
1,212
kW-months/year
$17,600
3,160
MMBtu
-
-
lb
-
-
$
-
-
$
02: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$4,830
Cost:
$75
- - - - - - - - - - $4,830 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$4,830
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$380
Cost:
$360
$60 2,638 $50 4 - - - - $270 - - - $60
2,638
kWh
$50
4
kW-months/year
-
-
MMBtu
-
-
lb
$270
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$315
Cost:
$35
$115 4,982 $200 15 - - - - - - - - $115
4,982
kWh
$200
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$300
Cost:
$500
$300 12,896 - - - - - - - - - - $300
12,896
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$240
Cost:
$400
- - - - - - $240 720 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$240
720
lb
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$170
Cost:
-
$170 7,327 - - - - - - - - - - $170
7,327
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,735
Cost:
$22,370
$16,645 722,450 $16,150 1,231 $17,600 3,160 $240 720 $270 - $4,830 - $16,645
722,450
kWh
$16,150
1,231
kW-months/year
$17,600
3,160
MMBtu
$240
720
lb
$270
-
$
$4,830
-
$
TOTAL IMPLEMENTED Savings:
$50,195
Cost:
$21,395
$16,175 702,227 $16,150 1,231 $17,600 3,160 - - $270 - - - $16,175
702,227
kWh
$16,150
1,231
kW-months/year
$17,600
3,160
MMBtu
-
-
lb
$270
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost