IAC logo
IAC Assessment: AM0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Heavy-wall stainless steel centrifugal castings
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 45,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 2,277
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,220 3,335,580 kWh $0.05
Electricity Demand $199,821 24,257 kW-months/year $8.24
Electricity Fees $165 - $ -
Natural Gas $52,882 24,783 MMBtu $2.13
TOTAL ENERGY COSTS $422,088
RECOMMENDED SAVINGS* $42,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,558
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.446 AUTOMATE FINISHING PROCESS Savings:
$34,153
Cost:
$120,000
- - - - - - $34,153 - -
-
kWh
-
-
kW-months/year
-
-
lb
$34,153
-
$
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$4,125
Cost:
$6,715
- - - - - - $4,125 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,125
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,500
Cost:
$1,240
$1,400 28,136 $1,100 133 - - - - $1,400
28,136
kWh
$1,100
133
kW-months/year
-
-
lb
-
-
$
04: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$435
Cost:
$150
- - - - $435 9,350 - - -
-
kWh
-
-
kW-months/year
$435
9,350
lb
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$375
Cost:
-
$375 13,482 - - - - - - $375
13,482
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$370
Cost:
-
$370 7,327 - - - - - - $370
7,327
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$280
Cost:
-
$280 5,569 - - - - - - $280
5,569
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$250
Cost:
-
$250 5,275 - - - - - - $250
5,275
kWh
-
-
kW-months/year
-
-
lb
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$185
Cost:
-
$185 3,517 - - - - - - $185
3,517
kWh
-
-
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$42,673
Cost:
$128,105
$2,860 63,306 $1,100 133 $435 9,350 $38,278 - $2,860
63,306
kWh
$1,100
133
kW-months/year
$435
9,350
lb
$38,278
-
$
TOTAL IMPLEMENTED Savings:
$37,558
Cost:
$121,240
$2,305 52,462 $1,100 133 - - $34,153 - $2,305
52,462
kWh
$1,100
133
kW-months/year
-
-
lb
$34,153
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes