IAC Assessment: AM0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Candles
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 265,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,544
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $380,510 9,873,388 kWh $0.04
Electricity Demand $139,387 21,956 kW-months/year $6.35
Natural Gas $116,375 19,231 MMBtu $6.05
TOTAL ENERGY COSTS $636,272
RECOMMENDED SAVINGS* $639,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$576,720
Cost:
$201,440
- - - - - - $576,720 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$576,720
-
$
-
-
$
-
-
$
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$30,000
Cost:
$2,905
- - - - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$30,000
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,600
Cost:
$41,200
- - $20,600 1,694 - - - - - - - - -
-
kWh
$20,600
1,694
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$4,920
Cost:
$600
$2,810 115,182 $2,110 174 - - - - - - - - $2,810
115,182
kWh
$2,110
174
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$4,274
Cost:
-
- - - - - - - - $4,274 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,274
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$1,930
Cost:
$300
$1,100 45,135 $830 68 - - - - - - - - $1,100
45,135
kWh
$830
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$410
Cost:
$100
$410 16,706 - - - - - - - - - - $410
16,706
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$430
Cost:
$120
- - - - $430 72 - - - - - - -
-
kWh
-
-
kW-months/year
$430
72
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$639,284
Cost:
$246,665
$4,320 177,023 $23,540 1,936 $430 72 $576,720 - $4,274 - $30,000 - $4,320
177,023
kWh
$23,540
1,936
kW-months/year
$430
72
MMBtu
$576,720
-
$
$4,274
-
$
$30,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost