IAC logo
IAC Assessment: AM0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Cabinets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 267,028 Pieces
Production Hrs. Annual 2,325
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,150 1,410,023 kWh $0.06
Electricity Demand $18,002 5,927 kW-months/year $3.04
Electricity Fees $812 - $ -
Natural Gas $23,674 6,423 MMBtu $3.69
TOTAL ENERGY COSTS $130,638
RECOMMENDED SAVINGS* $133,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$60,700
Cost:
-
- - - - $60,700 2,060,000 - - - - -
-
kWh
-
-
kW-months/year
$60,700
2,060,000
lb
-
-
$
-
-
$
02: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$51,000
Cost:
$780
- - - - - - - - $51,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$51,000
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,000
Cost:
$2,240
$10,000 196,366 - - - - - - - - $10,000
196,366
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,370
Cost:
$2,000
$7,370 141,559 - - - - - - - - $7,370
141,559
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,280
Cost:
$500
$1,280 24,912 - - - - - - - - $1,280
24,912
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,620
Cost:
$8,100
- - $2,620 474 - - - - - - -
-
kWh
$2,620
474
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$581
Cost:
-
- - - - - - $581 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$581
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$170
Cost:
$140
$170 3,517 - - - - - - - - $170
3,517
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,721
Cost:
$13,760
$18,820 366,354 $2,620 474 $60,700 2,060,000 $581 - $51,000 - $18,820
366,354
kWh
$2,620
474
kW-months/year
$60,700
2,060,000
lb
$581
-
$
$51,000
-
$
TOTAL IMPLEMENTED Savings:
$22,021
Cost:
$12,980
$18,820 366,354 $2,620 474 - - $581 - - - $18,820
366,354
kWh
$2,620
474
kW-months/year
-
-
lb
$581
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product