IAC Assessment: AM0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2001
Principal Product Oriented strand board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 213,000
Annual Production 310,000 Thousand Feet
Production Hrs. Annual 8,448
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,687,352 73,062,000 kWh $0.04
Electricity Demand $852,823 128,190 kW-months/year $6.65
Natural Gas $2,233,929 600,637 MMBtu $3.72
TOTAL ENERGY COSTS $5,774,104
RECOMMENDED SAVINGS* $162,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$67,500
Cost:
$1,500
- - - - $67,500 13,335 - - - - -
-
kWh
-
-
kW-months/year
$67,500
13,335
MMBtu
-
-
gal
-
-
lb
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$24,500
Cost:
-
- - - - - - - - $24,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$24,500
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,000
Cost:
$60,000
- - $20,000 2,834 - - - - - - -
-
kWh
$20,000
2,834
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$18,400
Cost:
-
- - - - - - - - $18,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$18,400
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$13,950
Cost:
-
$11,250 268,000 $2,700 381 - - - - - - $11,250
268,000
kWh
$2,700
381
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$11,700
Cost:
$1,400
- - - - - - - - $11,700 134,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$11,700
134,000
lb
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,700
Cost:
-
$3,800 90,000 $1,900 270 - - - - - - $3,800
90,000
kWh
$1,900
270
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
08: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM Savings:
$600
Cost:
-
- - - - - - $600 40,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$600
40,000
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$162,350
Cost:
$62,900
$15,050 358,000 $24,600 3,485 $67,500 13,335 $600 40,000 $54,600 134,000 $15,050
358,000
kWh
$24,600
3,485
kW-months/year
$67,500
13,335
MMBtu
$600
40,000
gal
$54,600
134,000
lb
TOTAL IMPLEMENTED Savings:
$68,600
Cost:
$60,000
$3,800 90,000 $21,900 3,104 - - - - $42,900 - $3,800
90,000
kWh
$21,900
3,104
kW-months/year
-
-
MMBtu
-
-
gal
$42,900
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)