IAC logo
IAC Assessment: AM0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 23,500 Thousand Feet
Production Hrs. Annual 2,416
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,681 3,059,000 kWh $0.06
Electricity Demand $51,147 14,379 kW-months/year $3.56
Electricity Fees $4,515 - $ -
TOTAL ENERGY COSTS $237,343
RECOMMENDED SAVINGS* $43,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,460
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$28,700
Cost:
$76,400
- - - - - - $28,700 - -
-
kWh
-
-
kW-months/year
-
-
$
$28,700
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,600
Cost:
$1,000
$5,600 121,800 - - - - - - $5,600
121,800
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,000
Cost:
-
- - $5,000 1,300 - - - - -
-
kWh
$5,000
1,300
kW-months/year
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,800
Cost:
$5,600
- - - - $2,800 - - - -
-
kWh
-
-
kW-months/year
$2,800
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$830
Cost:
$400
$830 18,000 - - - - - - $830
18,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$470
Cost:
-
$470 10,300 - - - - - - $470
10,300
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$320
Cost:
-
$250 5,450 $70 15 - - - - $250
5,450
kWh
$70
15
kW-months/year
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$230
Cost:
$40
$230 5,000 - - - - - - $230
5,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$43,950
Cost:
$83,440
$7,380 160,550 $5,070 1,315 $2,800 - $28,700 - $7,380
160,550
kWh
$5,070
1,315
kW-months/year
$2,800
-
$
$28,700
-
$
TOTAL IMPLEMENTED Savings:
$14,460
Cost:
$7,040
$6,660 144,800 $5,000 1,300 $2,800 - - - $6,660
144,800
kWh
$5,000
1,300
kW-months/year
$2,800
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost