IAC logo
IAC Assessment: AM0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Rebuilt turbine engine components
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 38,500
Annual Production 2,700 Pieces
Production Hrs. Annual 2,192
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,749 747,600 kWh $0.07
Electricity Fees $3,989 - $ -
Natural Gas $8,202 892 MMBtu $9.20
TOTAL ENERGY COSTS $62,940
RECOMMENDED SAVINGS* $31,892 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,602
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$18,602
Cost:
$2,302
- - - - - - $4,602 - - - $14,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,602
-
$
-
-
$
$14,000
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,050
Cost:
$750
- - - - - - - - $5,050 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$5,050
-
$
-
-
$
03: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,935
Cost:
$6,000
- - - - $2,935 8,775 - - - - - - -
-
kWh
-
-
kW-months/year
$2,935
8,775
lb
-
-
$
-
-
$
-
-
$
04: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,880
Cost:
$5,830
- - - - - - $1,880 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,880
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,300
Cost:
$1,160
$1,300 31,200 - - - - - - - - - - $1,300
31,200
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$765
Cost:
-
$425 10,350 $340 56 - - - - - - - - $425
10,350
kWh
$340
56
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$710
Cost:
$200
$710 17,230 - - - - - - - - - - $710
17,230
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$650
Cost:
-
- - - - $650 - - - - - - - -
-
kWh
-
-
kW-months/year
$650
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,892
Cost:
$16,242
$2,435 58,780 $340 56 $3,585 8,775 $6,482 - $5,050 - $14,000 - $2,435
58,780
kWh
$340
56
kW-months/year
$3,585
8,775
lb
$6,482
-
$
$5,050
-
$
$14,000
-
$
TOTAL IMPLEMENTED Savings:
$18,602
Cost:
$2,302
- - - - - - $4,602 - - - $14,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,602
-
$
-
-
$
$14,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost