Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Bentonite clay and thickening agents
NAICS 327992 - Ground or Treated Mineral and Earth Manufacturing
SIC 3295 - Minerals, Ground Or Treated
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 110,000
Annual Production 26,000 Tons
Production Hrs. Annual 8,616
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $643,395 18,859,800 kWh $0.03
Electricity Demand $137,408 16,027 kW-months/year $8.57
Natural Gas $931,780 262,477 MMBtu $3.55
TOTAL ENERGY COSTS $1,712,583
RECOMMENDED SAVINGS* $201,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $199,110
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 3.6111 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME Savings:
$111,100
Cost:
$8,000
- - - - $111,100 9,360,000 -
-
kWh
-
-
MMBtu
$111,100
9,360,000
Tgal
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$55,000
Cost:
$730
- - $55,000 16,700 - - -
-
kWh
$55,000
16,700
MMBtu
-
-
Tgal
03: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$23,000
Cost:
$11,000
- - - - $23,000 6,650,360 -
-
kWh
-
-
MMBtu
$23,000
6,650,360
Tgal
04: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$5,720
Cost:
$500
- - $5,720 1,740 - - -
-
kWh
$5,720
1,740
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,630
Cost:
$10,320
$2,630 69,210 - - - - $2,630
69,210
kWh
-
-
MMBtu
-
-
Tgal
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,970
Cost:
-
$1,970 51,870 - - - - $1,970
51,870
kWh
-
-
MMBtu
-
-
Tgal
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,520
Cost:
$860
$1,520 40,050 - - - - $1,520
40,050
kWh
-
-
MMBtu
-
-
Tgal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$800
Cost:
$200
$800 21,100 - - - - $800
21,100
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$201,740
Cost:
$31,610
$6,920 182,230 $60,720 18,440 $134,100 16,010,360 $6,920
182,230
kWh
$60,720
18,440
MMBtu
$134,100
16,010,360
Tgal
TOTAL IMPLEMENTED Savings:
$199,110
Cost:
$21,290
$4,290 113,020 $60,720 18,440 $134,100 16,010,360 $4,290
113,020
kWh
$60,720
18,440
MMBtu
$134,100
16,010,360
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal