Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2003 |
Principal Product | Coiled tubing |
NAICS | 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317 - Steel Pipe And Tubes |
Sales | $50,000,000-$100,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 37,500 |
Annual Production | 20,000 Thousand Feet |
Production Hrs. Annual | 5,540 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $585,195 | 6,679,337 | kWh | $0.09 |
Electricity Demand | $106,414 | 34,447 | kW-months/year | $3.09 |
TOTAL ENERGY COSTS | $691,609 | |||
RECOMMENDED SAVINGS* | $1,752,786 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $595,786 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION |
Savings: $1,157,000 Cost: - |
- | - | - | - | $1,157,000 | - | - | - | - | - |
- - kWh |
- - lb |
$1,157,000 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $243,880 Cost: $16,000 |
- | - | - | - | $243,880 | - | - | - | - | - |
- - kWh |
- - lb |
$243,880 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $154,000 Cost: $2,000 |
- | - | - | - | - | - | - | - | $154,000 | - |
- - kWh |
- - lb |
- - $ |
- - $ |
$154,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $110,500 Cost: - |
- | - | $110,500 | - | - | - | - | - | - | - |
- - kWh |
$110,500 - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $42,200 Cost: $700 |
- | - | $42,200 | 76,000 | - | - | - | - | - | - |
- - kWh |
$42,200 76,000 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $29,700 Cost: $650 |
$29,700 | 450,000 | - | - | - | - | - | - | - | - |
$29,700 450,000 kWh |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $13,500 Cost: $16,800 |
$13,500 | 202,000 | - | - | - | - | - | - | - | - |
$13,500 202,000 kWh |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $2,006 Cost: - |
- | - | - | - | - | - | $2,006 | - | - | - |
- - kWh |
- - lb |
- - $ |
$2,006 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,752,786 Cost: $36,150 |
$43,200 | 652,000 | $152,700 | 76,000 | $1,400,880 | - | $2,006 | - | $154,000 | - | $43,200 652,000 kWh |
$152,700 76,000 lb |
$1,400,880 - $ |
$2,006 - $ |
$154,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $595,786 Cost: $36,150 |
$43,200 | 652,000 | $152,700 | 76,000 | $243,880 | - | $2,006 | - | $154,000 | - | $43,200 652,000 kWh |
$152,700 76,000 lb |
$243,880 - $ |
$2,006 - $ |
$154,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product |