IAC Assessment: AM0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Printed corrugated paperboard boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 80,000
Annual Production 72,000 Thousand Feet
Production Hrs. Annual 2,120
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,752 378,582 kWh $0.07
Electricity Demand $13,420 1,891 kW-months/year $7.10
Natural Gas $11,378 1,381 MMBtu $8.24
TOTAL ENERGY COSTS $52,550
RECOMMENDED SAVINGS* $17,201 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$13,000
Cost:
-
- - - - $13,000 - - - -
-
kWh
-
-
kW-months/year
$13,000
-
$
-
-
$
02: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$2,770
Cost:
$7,800
- - - - - - $2,770 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,770
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$830
Cost:
$6,540
$600 15,300 $230 54 - - - - $600
15,300
kWh
$230
54
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$500
Cost:
$200
$310 8,000 $190 45 - - - - $310
8,000
kWh
$190
45
kW-months/year
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$101
Cost:
-
$63 1,600 $38 9 - - - - $63
1,600
kWh
$38
9
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,201
Cost:
$14,540
$973 24,900 $458 108 $13,000 - $2,770 - $973
24,900
kWh
$458
108
kW-months/year
$13,000
-
$
$2,770
-
$
TOTAL IMPLEMENTED Savings:
$500
Cost:
$200
$310 8,000 $190 45 - - - - $310
8,000
kWh
$190
45
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes