IAC Assessment: AM0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2004
Principal Product Industrial Coatings & Paint
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $100,000,000-$500,000,000
# of Employees 290
Plant Area (Sq.Ft.) 195,800
Annual Production 4,500 Thousand Gallons
Production Hrs. Annual 5,976
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $668,317 11,947,238 kWh $0.06
Electricity Fees $2,250 - $ -
Natural Gas $61,827 8,082 MMBtu $7.65
TOTAL ENERGY COSTS $732,394
RECOMMENDED SAVINGS* $40,138 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$18,000
Cost:
$4,600
$18,000 255,000 - - $18,000
255,000
kWh
-
-
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$12,000
Cost:
-
$12,000 171,000 - - $12,000
171,000
kWh
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,550
Cost:
-
$3,550 50,690 - - $3,550
50,690
kWh
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,050
Cost:
-
- - $3,050 352 -
-
kWh
$3,050
352
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,925
Cost:
$2,280
$1,925 27,500 - - $1,925
27,500
kWh
-
-
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,613
Cost:
-
$1,613 23,040 - - $1,613
23,040
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,138
Cost:
$6,880
$37,088 527,230 $3,050 352 $37,088
527,230
kWh
$3,050
352
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas