IAC logo
IAC Assessment: AM0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2004
Principal Product Mobile homes and factory-crafted residential homes
NAICS 321991 - Manufactured Home (Mobile Home) Manufacturing
SIC 2451 - Mobile Homes
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 120,000
Annual Production 650 Pieces
Production Hrs. Annual 2,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,226 1,319,192 kWh $0.06
Electricity Demand $40,531 8,115 kW-months/year $4.99
Natural Gas $22,897 2,980 MMBtu $7.68
TOTAL ENERGY COSTS $137,654
RECOMMENDED SAVINGS* $16,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,110
Cost:
-
$3,100 37,000 $1,010 170 - - - - $3,100
37,000
kWh
$1,010
170
kW-months/year
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,700
Cost:
$80
$2,700 48,000 $1,000 230 - - - - $2,700
48,000
kWh
$1,000
230
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,600
Cost:
$1,500
$3,600 63,600 - - - - - - $3,600
63,600
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,340
Cost:
$825
$3,340 39,310 - - - - - - $3,340
39,310
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$780
Cost:
$580
$280 5,000 $30 7 - - $470 - $280
5,000
kWh
$30
7
kW-months/year
-
-
lb
$470
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$650
Cost:
-
$590 10,500 $60 14 - - - - $590
10,500
kWh
$60
14
kW-months/year
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$620
Cost:
-
- - - - $620 216,000 - - -
-
kWh
-
-
kW-months/year
$620
216,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,800
Cost:
$2,985
$13,610 203,410 $2,100 421 $620 216,000 $470 - $13,610
203,410
kWh
$2,100
421
kW-months/year
$620
216,000
lb
$470
-
$
TOTAL IMPLEMENTED Savings:
$16,150
Cost:
$2,985
$13,020 192,910 $2,040 407 $620 216,000 $470 - $13,020
192,910
kWh
$2,040
407
kW-months/year
$620
216,000
lb
$470
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost