IAC logo
IAC Assessment: AM0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2005
Principal Product Car Shredders, Hyperbaric chambers, Large Ductwork
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 102,400
Annual Production 11 Pieces
Production Hrs. Annual 5,700
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,247 2,654,208 kWh $0.04
Electricity Demand $47,903 8,600 kW-months/year $5.57
TOTAL ENERGY COSTS $162,150
RECOMMENDED SAVINGS* $16,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$6,000
Cost:
$6,000
- - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$6,000
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,140
Cost:
-
$4,140 100,000 - - - - - - $4,140
100,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,500
Cost:
$5,200
- - - - $2,500 - - - -
-
kWh
-
-
kW-months/year
$2,500
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,760
Cost:
$1,000
$1,760 42,600 - - - - - - $1,760
42,600
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,700
Cost:
$500
$1,370 33,100 $330 47 - - - - $1,370
33,100
kWh
$330
47
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,100
Cost:
$12,700
$7,270 175,700 $330 47 $2,500 - $6,000 - $7,270
175,700
kWh
$330
47
kW-months/year
$2,500
-
$
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$8,400
Cost:
$6,200
$5,900 142,600 - - $2,500 - - - $5,900
142,600
kWh
-
-
kW-months/year
$2,500
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Ancillary Material Cost Primary Product