IAC logo
IAC Assessment: AM0495
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0495
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2005
Principal Product Remanufactured lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 28,000
Annual Production 26,000,000 Pounds
Production Hrs. Annual 2,576
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,500 608,400 kWh $0.06
Electricity Demand $19,188 4,888 kW-months/year $3.93
Electricity Fees $1,658 - $ -
TOTAL ENERGY COSTS $60,346
RECOMMENDED SAVINGS* $158,426 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$138,400
Cost:
$50,960
- - - - - - $138,400 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$138,400
-
$
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,300
Cost:
-
- - - - $6,300 - - - - - -
-
kWh
-
-
kW-months/year
$6,300
-
lb
-
-
$
-
-
$
03: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$5,940
Cost:
-
- - - - $5,940 - - - - - -
-
kWh
-
-
kW-months/year
$5,940
-
lb
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,820
Cost:
$230
$2,180 31,600 $640 164 - - - - - - $2,180
31,600
kWh
$640
164
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,990
Cost:
-
$1,990 28,900 - - - - - - - - $1,990
28,900
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,250
Cost:
$200
$1,000 14,500 $250 64 - - - - - - $1,000
14,500
kWh
$250
64
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,200
Cost:
$3,750
- - - - - - - - $1,200 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,200
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$280
Cost:
$33
$240 3,450 $40 11 - - - - - - $240
3,450
kWh
$40
11
kW-months/year
-
-
lb
-
-
$
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$246
Cost:
-
$190 2,780 $56 14 - - - - - - $190
2,780
kWh
$56
14
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$158,426
Cost:
$55,173
$5,600 81,230 $986 253 $12,240 - $138,400 - $1,200 - $5,600
81,230
kWh
$986
253
kW-months/year
$12,240
-
lb
$138,400
-
$
$1,200
-
$
TOTAL IMPLEMENTED Savings:
$19,780
Cost:
$4,213
$5,410 78,450 $930 239 $12,240 - - - $1,200 - $5,410
78,450
kWh
$930
239
kW-months/year
$12,240
-
lb
-
-
$
$1,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes