IAC logo
IAC Assessment: AM0504
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0504
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Metal stampings
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 80,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 4,700
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,484 3,167,520 kWh $0.03
Electricity Demand $77,039 8,958 kW-months/year $8.60
Electricity Fees $2,400 - $ -
TOTAL ENERGY COSTS $185,923
RECOMMENDED SAVINGS* $22,281 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,000
Cost:
$1,000
$15,200 220,000 $1,800 560 - - - - $15,200
220,000
kWh
$1,800
560
kW-months/year
-
-
lb
-
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,400
Cost:
$7,650
- - - - - - $2,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,400
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,155
Cost:
-
$1,034 14,988 $121 38 - - - - $1,034
14,988
kWh
$121
38
kW-months/year
-
-
lb
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$686
Cost:
-
$620 8,960 $66 21 - - - - $620
8,960
kWh
$66
21
kW-months/year
-
-
lb
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$455
Cost:
-
- - - - $455 59,000 - - -
-
kWh
-
-
kW-months/year
$455
59,000
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$420
Cost:
-
- - - - $420 6,400 - - -
-
kWh
-
-
kW-months/year
$420
6,400
lb
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$165
Cost:
-
$165 4,000 - - - - - - $165
4,000
kWh
-
-
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$22,281
Cost:
$8,650
$17,019 247,948 $1,987 619 $875 65,400 $2,400 - $17,019
247,948
kWh
$1,987
619
kW-months/year
$875
65,400
lb
$2,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes