IAC logo
IAC Assessment: AM0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2007
Principal Product Library furniture
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2531 - Public Building & Related Furniture
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 93,618
Annual Production 21,600 Pieces
Production Hrs. Annual 3,233
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,724 550,272 kWh $0.10
Electricity Demand $30,684 3,336 kW-months/year $9.20
Natural Gas $22,628 2,722 MMBtu $8.31
TOTAL ENERGY COSTS $107,036
RECOMMENDED SAVINGS* $31,505 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,505
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,500
Cost:
$1,000
$10,470 103,700 $2,030 385 - - - - $10,470
103,700
kWh
$2,030
385
kW-months/year
-
-
$
-
-
$
02: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE Savings:
$11,700
Cost:
$500
$9,800 97,000 $1,900 360 - - - - $9,800
97,000
kWh
$1,900
360
kW-months/year
-
-
$
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$4,560
Cost:
-
- - - - - - $4,560 - -
-
kWh
-
-
kW-months/year
-
-
$
$4,560
-
$
04: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$1,810
Cost:
-
$2,540 25,150 - - $(-730) - - - $2,540
25,150
kWh
-
-
kW-months/year
$(-730)
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$390
Cost:
$6
$330 3,270 $60 12 - - - - $330
3,270
kWh
$60
12
kW-months/year
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$340
Cost:
-
$340 3,370 - - - - - - $340
3,370
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$205
Cost:
-
$170 1,710 $35 7 - - - - $170
1,710
kWh
$35
7
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,505
Cost:
$1,506
$23,650 234,200 $4,025 764 $(-730) - $4,560 - $23,650
234,200
kWh
$4,025
764
kW-months/year
$(-730)
-
$
$4,560
-
$
TOTAL IMPLEMENTED Savings:
$31,505
Cost:
$1,506
$23,650 234,200 $4,025 764 $(-730) - $4,560 - $23,650
234,200
kWh
$4,025
764
kW-months/year
$(-730)
-
$
$4,560
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost