IAC Assessment: AM0529
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0529
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2007
Principal Product Cakes, ice cream, fruit
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 200,000
Annual Production 6,688,000 Pounds
Production Hrs. Annual 6,200
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,379,544 15,812,000 kWh $0.09
Electricity Demand $200,169 39,288 kW-months/year $5.09
Electricity Fees $30,272 - $ -
Natural Gas $185,599 17,556 MMBtu $10.57
TOTAL ENERGY COSTS $1,795,584
RECOMMENDED SAVINGS* $130,355 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,738
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9131 INSTALL HYDROGEN FUEL CELL Savings:
$59,020
Cost:
$250,000
- - - - $59,020 5,475 - - -
-
kWh
-
-
kW-months/year
$59,020
5,475
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$41,500
Cost:
$86,400
- - $41,500 8,580 - - - - -
-
kWh
$41,500
8,580
kW-months/year
-
-
MMBtu
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$18,360
Cost:
$8,240
- - - - - - $18,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,360
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$3,210
Cost:
$52,600
$2,320 25,600 $890 180 - - - - $2,320
25,600
kWh
$890
180
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,110
Cost:
$2,165
$2,250 24,800 $860 117 - - - - $2,250
24,800
kWh
$860
117
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,160
Cost:
$360
$1,900 20,906 $260 52 - - - - $1,900
20,906
kWh
$260
52
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,027
Cost:
-
$1,570 17,300 $457 92 - - - - $1,570
17,300
kWh
$457
92
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$968
Cost:
-
$874 9,630 $94 19 - - - - $874
9,630
kWh
$94
19
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$130,355
Cost:
$399,765
$8,914 98,236 $44,061 9,040 $59,020 5,475 $18,360 - $8,914
98,236
kWh
$44,061
9,040
kW-months/year
$59,020
5,475
MMBtu
$18,360
-
$
TOTAL IMPLEMENTED Savings:
$47,738
Cost:
$88,925
$5,024 55,336 $42,714 8,768 - - - - $5,024
55,336
kWh
$42,714
8,768
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost