IAC logo
IAC Assessment: AM0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 55,000
Annual Production 30,000 Thousand Gallons
Production Hrs. Annual 7,440
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $323,386 7,881,144 kWh $0.04
Electricity Demand $114,380 16,324 kW-months/year $7.01
Electricity Fees $11,473 - $ -
Natural Gas $80,996 19,824 MMBtu $4.09
TOTAL ENERGY COSTS $530,235
RECOMMENDED SAVINGS* $80,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,546
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$66,393
Cost:
$99,038
$(-2,024) (-49,375) - - $68,417 - $(-2,024)
(-49,375)
kWh
-
-
kW-months/year
$68,417
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,546
Cost:
$980
$7,546 184,045 $2,000 296 - - $7,546
184,045
kWh
$2,000
296
kW-months/year
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,906
Cost:
-
$2,171 52,948 $735 108 - - $2,171
52,948
kWh
$735
108
kW-months/year
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,384
Cost:
$520
$874 21,305 $510 75 - - $874
21,305
kWh
$510
75
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$609
Cost:
$2,640
$609 14,846 - - - - $609
14,846
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$80,838
Cost:
$103,178
$9,176 223,769 $3,245 479 $68,417 - $9,176
223,769
kWh
$3,245
479
kW-months/year
$68,417
-
$
TOTAL IMPLEMENTED Savings:
$9,546
Cost:
$980
$7,546 184,045 $2,000 296 - - $7,546
184,045
kWh
$2,000
296
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes