Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2014 |
Principal Product | Steel and plastic composite drums and containers |
NAICS | 332439 - Other Metal Container Manufacturing |
SIC | 3412 - Metal Barrels, Drums, And Pails |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 3,720,000 Pieces |
Production Hrs. Annual | 8,544 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $301,912 | 7,156,669 | kWh | $0.04 |
Electricity Demand | $145,102 | 15,797 | kW-months/year | $9.19 |
Electricity Fees | $10,301 | - | $ | - |
Natural Gas | $540,810 | 123,472 | MMBtu | $4.38 |
TOTAL ENERGY COSTS | $1,204,699 | |||
RECOMMENDED SAVINGS* | $249,045 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $117,400 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $112,575 Cost: $24,000 |
- | - | - | - | - | - | $112,575 | - |
- - kWh |
- - kW-months/year |
- - $ |
$112,575 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $108,485 Cost: $9,000 |
$(-450) | (-9,730) | $(-145) | (-17) | $109,080 | - | - | - |
$(-450) (-9,730) kWh |
$(-145) (-17) kW-months/year |
$109,080 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13,490 Cost: $150 |
$10,590 | 230,130 | $2,900 | 330 | - | - | - | - |
$10,590 230,130 kWh |
$2,900 330 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,110 Cost: $200 |
$6,360 | 138,300 | $1,750 | 201 | - | - | - | - |
$6,360 138,300 kWh |
$1,750 201 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $3,690 Cost: - |
$2,830 | 61,570 | $860 | 100 | - | - | - | - |
$2,830 61,570 kWh |
$860 100 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $790 Cost: - |
$590 | 12,920 | $200 | 23 | - | - | - | - |
$590 12,920 kWh |
$200 23 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $770 Cost: $60 |
$610 | 13,240 | $160 | 18 | - | - | - | - |
$610 13,240 kWh |
$160 18 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $650 Cost: - |
$650 | 14,100 | - | - | - | - | - | - |
$650 14,100 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $250 Cost: $55 |
$160 | 3,510 | $90 | 10 | - | - | - | - |
$160 3,510 kWh |
$90 10 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $235 Cost: $30 |
$185 | 4,030 | $50 | 6 | - | - | - | - |
$185 4,030 kWh |
$50 6 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $249,045 Cost: $33,495 |
$21,525 | 468,070 | $5,865 | 671 | $109,080 | - | $112,575 | - | $21,525 468,070 kWh |
$5,865 671 kW-months/year |
$109,080 - $ |
$112,575 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $117,400 Cost: $24,085 |
$3,825 | 83,210 | $1,000 | 116 | - | - | $112,575 | - | $3,825 83,210 kWh |
$1,000 116 kW-months/year |
- - $ |
$112,575 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product |